Integrating Google Stitch MCP with Claude Code: Automate UI Design with AI
Learn how to connect Google Stitch with Claude Code via MCP to generate professional-grade UI designs from text prompts.

Integrating Google Stitch MCP with Claude Code: Automate UI Design with AI
Learn how to connect Google Stitch with Claude Code via MCP to generate professional-grade UI designs from text prompts.
Introduction
Google recently launched Stitch, an AI tool that generates high-quality UI designs from text prompts. In this guide, we'll walk through the complete process of integrating Stitch with Claude Code (Anthropic's CLI tool) using the Model Context Protocol (MCP).
What You'll Learn
- Setting up a Google Cloud project
- Creating a service account and configuring permissions
- Configuring the Stitch MCP server
- Real-world UI generation examples
Prerequisites
- Google account
- Node.js 18+ installed
- Claude Code installed (or any MCP-compatible client)
gcloudCLI installed
Note: This guide uses the stitch-mcp package from this repository. Google's official method uses Remote MCP, but requires manually refreshing the Access Token every hour. The approach in this guide uses a Service Account JSON for automatic token renewal, making it more convenient.
Step 1: Create a Google Cloud Project
1.1 Access Google Cloud Console
Navigate to Google Cloud Console.

1.2 Create a New Project
- Click the project selector dropdown at the top
- Click "New Project" button
- Enter a project name (e.g.,
my-stitch-project) - Click "Create"


Once created, your project will be assigned a Project ID. Note this down—you'll need it later.

Step 2: Enable the Stitch API
2.1 Find Stitch API in the Library
Related Posts
Google Stitch MCP API: Generate UI Designs via AI Agents
Google Labs Stitch now supports MCP servers, allowing AI tools like Claude Code and Cursor to generate UI designs through API calls. Note: Some details in this article are from unofficial sources and may change.

Qwen3-Max-Thinking Snapshot Release: A New Standard in Reasoning AI
The recent trend in the LLM market goes beyond simply learning "more data" — it's now focused on "how the model thinks." Alibaba Cloud has released an API snapshot (qwen3-max-2026-01-23) of its most powerful model, Qwen3-Max-Thinking.

Securing ClawdBot with Cloudflare Tunnel
Learn about the security risks of exposed ClawdBot instances on Shodan and how to secure them using Cloudflare Tunnel.